Depending on pool size, type, and terrain conditions, it is generally completed in 4-8 weeks. You can get a free site survey and quote for a detailed timeline.
Was this answer helpful?
Pool flow is the circulation of water within the pool. For good flow, suction and return points must be correctly positioned, dead zones must be eliminated, and all water must be equally subjected to filtration.