About the Project

A large-scale pool designed for the Gold Bau construction project in Istanbul, Turkey. Professional equipment and system design at hotel standards were implemented.

Project Features

  • Pool Size: 33×15 meters
  • Depth: 1.20m - 1.80m
  • Pool Type: Olympic Overflow
  • Finish: Industrial Ceramic
  • Capacity: 200+ people

Professional Infrastructure

Fully automatic filtration and chemical dosing system, SCADA monitoring, multi-pump configuration, and redundant system design ensure 24/7 uninterrupted operation.

Project Features

SCADA Control
SCADA integrated remote control
Multi Pump
Dual pump parallel operation system
Backup System
Automatic backup switchover
Olympic Size
25m x 12.5m olympic size pool
24/7 Operation
Non-stop filtration and disinfection

Technologies Used

SCADA System
Central monitoring and control
VFD Pumps
Variable speed energy saving
Ozone Generator
Advanced disinfection
BMS Integration
Building automation connection

Project Information

Client: Gold Bau Construction
Location: Turkey, Istanbul
End Date: 20.10.2023
Size: 500 m²
Category: Hotel Pools
Status: Completed
Views: 86 views

Want a Similar Project?

Evaluate your project with our expert team

Contact Us

Let's Design Your Dream Pool Together

Our expert team is ready to offer you the most suitable pool solution. Contact us now for free site visit and quote!

Contact Us
Get a Quote Call Now WhatsApp